Compaq ProLiant DL380 G3 with MSA500 Guía de instalación Pagina 34

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 55
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 33
Setup and Installation in a Rack
1. Locate the following materials necessary for installing the storage system.
Table 5-1: Rack-Mounting Hardware and Template
Item Description
1 Rack rail (left)
2 Rack rail (right)
3 Pins for round-hole rack conversion
4 4U rack template
IMPORTANT: Install the storage system in the rack, leaving enough space above to install
the servers. The following procedure details installation in a square-hole rack. For installation
procedures concerning round-hole racks, refer to the HP StorageWorks Modular Smart Array
500 System User Guide on the Documentation CD.
HP ProLiant DL380 Generation 3 Packaged Cluster Setup and Installation Guide 5-3
HP CONFIDENTIAL
Writer: Woody Jernigan File Name: f-ch5 Setup and Installation in a Rack
Codename: Sopwith Part Number: 252621-003 Last Saved On: 9/17/03 1:02 PM
Vista de pagina 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 54 55

Comentarios a estos manuales

Sin comentarios