Compaq ProLiant Storage System U1 Guía de usuario Pagina 83

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 110
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 82
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5-7 Option Installation
Compaq ProLiant Storage System /U User Guide
3. Align the Recovery Server I/O board in the opening and slide it forward
in the rails as far as it will go with the latches fully open.
4. Close the latches against the rear panel until they snap into place.
Levers on each latch should catch behind the metal lip drawing the
board into position and securing it in place.
TROJ025.EPS
Figure 5-4.
Installing the optional Recovery Server I/O board
5. Replace the AC power cord(s).
This completes the hardware installation of the Recovery Server Option. Refer
to the Recovery Server Option User Guide furnished in this option kit for
information on connecting the ProLiant Storage System /U to the servers in one
of several configurations.
Vista de pagina 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 109 110

Comentarios a estos manuales

Sin comentarios