2-18 Compaq StorageWorks Fibre Channel Storage Hub 12 Installation Guide
Compaq Confidential – Need to Know Required
Writer: Susan Caesar Project: Compaq StorageWorks Fibre Channel Storage Hub 12 Installation Guide Comments:
Part Number: 340662-002 File Name: c-ch2 Overview of Installing the Compaq StorageWorks Fibre Channel Storage Hub 12.doc Last Saved
On: 4/16/99 8:19 AM
2. Verify that the top green GBIC LEDs illuminate on all ports where
GBIC Modules are installed.
G
2
B
Figure 2-17. Checking the GBIC LEDs
3. Verify that the bottom amber Bypass Port LEDs illuminate on all
connected ports that are not participating on the loop. For example, Port
2 in the figure below is not participating in the loop. Ports that do not
detect valid FC-AL links will be bypassed automatically. To be a valid
link, both ends of the cable must be connected to active, powered, FC-
AL devices.
G
3
B
Figure 2-18. Bypass Port 2 LED illuminates when port is not participating on
the loop